Process chain event should trigger only after success

$
0
0

Hi Gurus,

 

I have a meta chain with local chains as you can see in the picture.The process chain is designed in such a way that when the 1st step fails or goes to success the 2nd step is triggered. I am trying to set the event to success so that when the 1st step fails the process chain shouldnt trigger the 2nd step. I have no dependecy from 1->3, so even if 1 fails 3 should run, but when 1 fails 2 cannot run. So i am trying to change the event to success from 1->2  and from 1->3 it can be either success/failure. It doesn't allow me do it , it allows only 1 event status at a time i.e. success for both 2 and 3 or success/failure for both 2 and 3.

 

Help will be rewarded with points. Thanks in advance.

PC.PNG

Regards,

FM.


Viewing all articles
Browse latest Browse all 2136

Latest Images

Trending Articles



Latest Images

<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>