Dear Gurus
i need to implementation planning strategy 60 for my customer.
I have execute the following steps:
1) Create Material planning with strategy 60 with reduce period anche MRP dual = 3
2) Create 2 FG in which in the MRP3 i have inserted planning material and Plant.
3) Create a Bom for Material planning with component FG1 and FG2 .
4) Create Ind. Req (md61 ) for planning material.
Now when i created a new sales order for FG1 i would like that the PIR for planning material is reduced from the same quantity but the PIR quantity in material planning is always the same.
What i can check for to have the standard scenary (60)?
Thanks a lot
Daniele